A report on the technical specifications for designing a solar thermal hybrid power plant.
Report extract
RAC is currently completing a competitive and commercially sensitive tender process to select the Engineering, Procurement and Construction (EPC) works supplier and the Operations and Maintenance (O&M) services supplier.
The Design Study Report summarises the technical and commercial works required to prepare the appropriate tender documentation for the EPC Contract and the O&M Contract.
The work includes the following sections:
- Technical specification and general arrangement drawings;
- Process flow diagrams, piping and instrumentation diagram (P&ID) and Heat balance diagrams;
- Draft engineering, procurement and construction contracts;
- Other tender documentation; and
- Gas supply design study.
The key non-commercially sensitive learnings gained during the development of the Design Study Report are outlined in the following sections.