The 2023 Annual report for Fortescue APA Solar Gas Hybrid Project, highlights forecasting and improvement to their operation of the 60MW Solar PV Power Station. The reports delves into forecasting, battery performance and operation lessons learnt.
Report extract
The Alinta Energy Group (Alinta) completed the construction of the Chichester Solar Gas Hybrid Project (the Project) in the Pilbara region of Western Australia (WA) achieving practical completion in November 2021.
On 1 November 2023 APA Group Limited (APA) acquired Alinta’s Pilbara Energy Operations which included power generation and transmission assets in Port Hedland, Newman and included the Chichester Solar Gas Hybrid project.
This annual report focuses on the refinement of the system forecasting developed during the project design stages, optimisation of solar performance and lesson learnt from operational issues.
The Chichester Solar Gas Hybrid project is a 60MW solar farm integrated with a battery energy storage system, to supply power to Fortescue Metal Group’s Chichester Hub mining operations.
The report details the process, experiences and learnings from the project including:
- Project objectives,
- System forecasting results
- Performance of the solar farms,
- Lessons learnt and key findings