This Lessons Learnt Report outlines the key learnings Meridian Energy Australia has learnt from the period between October 2019 – April 2020.
Report extract
The 44 degree day on January 31st, 2020 revealed a need for us to check the temperature data from inside the turbines. That day, despite high winds, yielded low-to-moderate farm output power during the peak heat of the afternoon. After some investigation, we determined the cause of this was the internal temperature sensors of the turbines reached a temperature high enough to trigger internal shut-down.