This report prepared by PB Power outlines the basic review of the technical sections of the engineering procurement and construction (EPC) bids received for the Collinsville 30MW Solar Thermal Power Station (CSTPS). The report includes a summary of abridged technical evaluation and identifies a provisionally preferred bidder.
Report extract
This Knowledge Sharing Report for Public Release contains a summary of the learnings and knowledge gained during this phase of the Project, including publicly-releasable information from the following reports provided to ARENA:
- Technical Cost Estimate;
- Network System Studies;
- Development Approval process/documents; and
- Formal Network Connection application to Ergon Energy