A report on the preliminary financial model and marginal loss factor analysis report.
Report extract
RAC engaged Parsons Brinckerhoff to provide a modeling and optimization report. As part of this investigation, a commercial and technical comparison has been made between 1) utilising the existing power block or 2) the installation of new plant to establish the power block. This report considers the modelling and potential plant optimisation of these two options to establish projected generation yields.
The outcomes of this modelling and optimisation report have been used as part of a full life cycle financial evaluation described in the following section.