Protected: Peak Demand Reduction using Solar and Storage

  • $450k

    ARENA Funding

  • $1.23m

    Total Project Value

United Energy (UE) is to undertake a targeted deployment of behind the meter installations of solar and storage systems located at constrained or overloaded substations in order to validate that the units can be controlled in concert to defer investment in planned substation augmentation projects.

UE has identified ten constrained (overloaded) distribution substations within its distribution network for rectification, whereby solar and storage is more economic than traditional network augmentation. These substations require a total of 42 customers to be recruited for behind the meter installations of solar and storage in order to bring the substations back to within its power rating.

UE expect to install and operate the solar storage systems this year and undertake testing in the summer 2017/18.

  • Project basics

    ARENA Program

    Advancing renewables

    Lead Organisation

    United Energy Distribution Pty Ltd

    Start Date

    Jul 2017

    Project Partners

    N/A

    Location

    Victoria

    Status

    Current

Project Basics

ARENA Program

Advancing renewables

Lead Organisation

United Energy Distribution Pty Ltd

Start Date

Jul 2017

Project Partners

N/A

Location

Victoria

Status

Current

This content is password protected. To view it please enter your password below:

Contact information

Dr Hedy Dalvand

(03) 8846 9933

hedy.dalvand@ue.com.au

Close
Sign up to our mailing list to stay up to date with all the latest news in renewable energy.