AGL worked with Essential Energy to define the requirements for connecting into the Essential Energy network at Nyngan.
Report extract
Negotiating a grid connection with a Network Service Provider (NSP) is technically and commercially challenging. Defining the technical characteristics of the solar plant and determining how the plant will interact with the network during fault events may require extensive, iterative modelling.