This report gives consideration to transmission easement conditions at the Nyngan Solar Plant.
Report extract
Construction of a utility scale solar project in regional Australia will typically require the construction of a transmission line in order to connect the solar plant to the grid. Construction and operation of the transmission line will require the creation of an easement in order to provide a registered legal right that applies over the land. This process needs to consider the specific requirements of the Network Services Provider (NSP) – Essential Energy for the Nyngan Solar Plant and other landholders.