Summary
Grampians Wimmera Mallee Water Corporation (GWM Water) will complete a feasibility study into optimising system operations across its 40km long Dimboola-to-Nhill urban water supply pipeline in Victoria. The Study will involve designing and testing a pilot program using software to strategically schedule pumping activities and optimise energy efficiency through reduced friction losses across the Network.