Summary

(Project closed 8 March 2016) The Kogan Creek Solar Boost Project set out to install a 44 megawatts of concentrating solar power (CSP) at CS Energy’s 750 megawatt coal-fired Kogan Creek Power Station.

Project innovation

The project intended to demonstrate the hybridisation of solar thermal and coal-fired power generation on a large scale, and provide key insights into the construction and operation of hybrid renewable/fossil thermal plants.

Benefit

Valuable insights gained during the project will be used to strengthen future renewable energy developments.