Skip to Content
Project overview
  • Lead Organisation

    Chargefox

    Location

    South Australia
    Western Australia

    ARENA Program

    Future Fuels Fund (Round 1)

  • Start date

    1 June 2021

    End date

    31 October 2023

  • Project Partners
    None

Summary

The Chargefox Future Fuels Public Fast Charging project will deliver 16 fast charging stations across Adelaide and Perth.

Need

The Chargefox Future Fuels Public Fast Charging project acknowledged that the Australian EV industry is in the early stages of development. In cities and regional centres, charging blackspots (i.e. areas without convenient access to public fast-charging stations) have been identified as a key barrier to the adoption of EVs for both the public and fleets. This project will increase the availability of public fast charging infrastructure to reduce blackspots and provide convenient recharging options for EV owners.

Action

Chargefox will install a network of public fast charging stations in Adelaide and Perth. Each station will provide at least two designated EV charging parking spots and will have a capacity of at least 100 kW.

Outcome

This project aims to:

  1. address barriers to the adoption of EVs by increasing the number of public fast charging stations
  2. reduce emissions by ensuring all sites are powered by renewable energy
  3. improve understanding of how consumers use public fast charging stations.
Last updated 10 August 2022

ARENAWIRE Blogs

EV charging network receives $24 million boost

Hundreds of new EV charging stations will be built around the country.

Print Friendly, PDF & Email
Back to top