Skip to Content
Project overview
  • Lead Organisation

    Monash University

    Location

    Victoria

    ARENA Program

    International Engagement Program

  • Start date

    5 June 2018

    End date

    30 June 2022

  • Project Partners
    None
    This renewables project was completed on 30 June 2022.

Summary

A study of enabling technologies to enhance Australian participation in the International Energy Agency (IEA) Technology Collaboration Program (TCP) for Demand Side Management.

Last updated
11 November 2022
Last updated 11 November 2022

ARENAWIRE Blogs

Plotting next steps in distributed energy transformation

As Australians embrace rooftop solar at world-leading rates, work is underway to create a modern, fairer electricity system for the future.

What are distributed energy resources and how do they work?

According to the twentieth century model of energy distribution, large power plants fuelled by coal, hydro or gas, generated electricity that was distributed via a centralised grid.

Print Friendly, PDF & Email
Back to top